A lengthy 10,000 foot manifest inches forward on the main in order to fit into West Alton (10,600 foot siding) for a pass.
A smoky Dash 9 leading a 10,000 foot train near West Alton, Missouri.
While waiting for storms to initiate over the Laramie Mountains behind me, we see a northbound BNSF Cheyenne-Donkey Creek loaded ballast train move right along through Slater, Wyoming, on July 21,... (more)
BNSF 5085 (Dash9) and Canadian Pacific partner bring a double stack train out of the Denver Yard.
Grain
A westbound BNSF manifest was accelerating through the dip at West Darling, AZ and getting a swing on the climb up to Cosnino on Sept. 20, 2004, led by C44-9W No. 5085.
5 GE's handle this 152 platform stack train west on the Gallup Sub. 2 of the 5 engines are operating on the tail-end in DP mode.
Here comes a Seattle bound stacker racing through town with a BNSF Dash 9 #5085, and a CSX AC4400CW #5004.
Eastbound headed for Marias Pass.